Draft Calendar of Workshop Events

DATE

Monday, June 11

Tuesday, June 12

Wednesday, June 13

Thursday, June 14

Friday, June 15

8:30-9:30

Ice-Breaker/Intro

Introduction to the Standard Model

Mike Berger (TBC)

Astrophysics/ Cosmics discussion

Jim Musser (TBC)

Discuss system electronics

Discuss current data

9:30-10:30

Overview:

Rick Van Kooten

Basics of Web Page design

IU Inst. Tech (TBC)

Solar lab tour

Discuss possible experiments

School teams meet

Discuss collaboration web site

School teams meet

10:30-11:30

PMT Basics

Cherenkov Radiation

PMT Plateau

PMT advanced

Rick Van Kooten

PMT calibration

Electronics discussion

Rick Van Kooten

Beams and accelerators

Bob Pollock (TBC)

Cyclotron tour

 

Lunch

Lunch

Lunch

Lunch

Lunch

12:30-1:00

Swain Tour

Visit to prototype 2000

Group instructions and assignments

Group instructions and assignments

Group questions/problems

Group instructions and assignments

Group questions/problems

Group instructions and assignments

Group questions/problems

Complete journals

1:00-4:00

Up: Design workshop web pages, assist T&B teams

Down: Data reduction, graphing tools, assist T&B teams

Top: Plateau PMT's

Bottom: Assemble and light proof scintillation plates, wave guides and PMT's

Up: Post plateau data as available, Design collaboration web site, assist T&B teams

Down: Graph plateau data, calculate telescope field as function of scintillation plate separation, research cosmic rays to prepare ideas for research project, assist T&B teams

Top: Plateau PMT's, calibrate PMT's, Assemble prototype electronics module

Bottom: Assemble and light proof scintillation plates, wave guides and PMT's

Up: Post plateau data as available, post workshop notes and pictures, design collaboration web site, assist T&B teams

Down: Graph plateau and calibration data, research cosmic rays to prepare ideas for research project (goal is three proposals assist T&B teams

Top: Calibrate PMT's, assemble prototype electronics module

Bottom: Assemble and light proof scintillation plates, wave guides and PMT's, Assemble prototype cosmic telescope stand and frame

Up: Post calibration and plateau data as available, post workshop notes and pictures as available, create collaboration website, assist T&B teams

Down: Graph calibration and plateau data, prepare ideas for research project and post to web, assist T&B teams

Top: Test electronics prototype and make technical notes for workshop website

Bottom: Complete assembly, and make assembly notes for workshop web site

Prepare reports until 2:30

 

2:30 Start reports (20 minutes per group)

4:00-4:30

Group reflection

Heads-on: Journal

Hands-on Journal

Staff meeting

Group reflection

Heads-on: Journal

Hands-on Journal

Staff meeting

Group reflection

Heads-on: Journal

Hands-on Journal

Staff meeting

Group reflection

Heads-on: Journal

Hands-on Journal

Staff meeting

School groups meet to plan completion of their telescope

4:30-9:00

Campus tour

BBQ at Dave's

Recreation at the Union ($)

Other?

Dinner

Spelunking  ($4.00)

SRSC ($5)

Movie ($7)

Other?

Dinner

Wall climbing ($13)

SRSC ($5)

Music at IU

Other?

Dinner

Outdoor swimming ($2.50)

Indoor swimming ($3.50)

SRSC ($5)

Other?

Dinner

To Fermilab